• OPEN AN ACCOUNT
A+| A| A-|
Indian Indices
Sensex
74,221.28 1,524.89
( 2.10%)
Global Indices
Nasdaq
46,234.46 635.98
(1.39%)
Dow Jones
6,603.33 75.85
(1.16%)
Hang Seng
52,101.04 585.55
(1.14%)
Nikkei 225
9,923.24 4.91
(0.05%)
Forex
USD-INR
93.49 0.36
(0.39%)
EUR-INR
108.15 0.98
(0.91%)
GBP-INR
124.68 0.54
(0.44%)
JPY-INR
0.59 0.00
(0.10%)

EQUITY - MARKET SCREENER

Kotak Mahindra Bank Ltd
Industry :  Banks - Private Sector
BSE Code
ISIN Demat
Book Value()
500247
INE237A01036
125.8314885
NSE Symbol
P/E(TTM)
Mar.Cap( Cr.)
KOTAKBANK
26.18
354442
EPS(TTM)
Face Value()
Div & Yield %
13.61
1
0.14
 

radhagobind commercial ltd
Larsen & Toubro secures orders under its power transmission and distribution biz
Feb 25,2026

The Power Transmission & Distribution (PT&D) vertical of Larsen & Toubro has secured a batch of EPC orders to establish electricity grid system elements in India and abroad. According to the company's project classification, the value of the orders ranges between Rs 5,000 crore to Rs 10,000 crore.

In India, PT&D has received order for design, supply and construction of two 220 kV Gas Insulated Substations in the Durgapur–Raniganj–Asansol industrial belt of West Bengal. The scope also includes associated transmission line segments with advanced conductors and multi-circuit towers. These grid modernisation jobs will provide a stable voltage profile and enhance reliability of power networks for infrastructure and industrial projects in the region.

In the Middle East, PT&D has won orders from key utilities for the turnkey construction of five substations and over 250 KM transmission lines. Located in three different countries in the region, these projects are up to 500 kV level. In one of the projects, the scope also involves supplying and installing a 400 kV underground cable system.

In view of surging demand, shifting nature of energy mix and security driven initiatives, grid investments have become high-stake, high-tech priority areas for economic forerunners. These orders reflect the unflinching customer trust on L&T for safe, flawless, sustainable and timely creation of grid backbone.