• OPEN AN ACCOUNT
Indian Indices
Nifty
25,141.40 37.15
(0.15%)
Sensex
81,663.58 -851.56
( -1.03%)
Bank Nifty
56,459.75 -169.35
( -0.30%)
Nifty IT
38,784.30 484.35
( 1.26%)
Global Indices
Nasdaq
42,897.32 9.44
(0.02%)
Dow Jones
6,044.79 -15.02
(-0.25%)
Hang Seng
38,173.44 -247.75
(-0.64%)
Nikkei 225
8,864.35 11.27
(0.13%)
Forex
USD-INR
85.60 -0.07
(-0.08%)
EUR-INR
97.72 -0.09
(-0.09%)
GBP-INR
115.65 -0.47
(-0.40%)
JPY-INR
0.59 0.00
(-0.31%)

EQUITY - MARKET SCREENER

Kitex Garments Ltd
Industry :  Textiles - Products
BSE Code
ISIN Demat
Book Value()
521248
INE602G01020
55.4200501
NSE Symbol
P/E(TTM)
Mar.Cap( Cr.)
KITEX
36.87
5641.86
EPS(TTM)
Face Value()
Div & Yield %
7.67
1
0
 

nelco ltd
Mercury EV-Tech announces commissioning of 3.2 GW lithium-ion battery manufacturing unit at Vadodara
Apr 15,2025
Mercury EV-Tech, through its wholly owned subsidiary PowerMetz Energy, has announced the commissioning of a 3.2 GW lithium-ion battery manufacturing facility at its Vadodara campus.

What sets this facility apart is its multi-chemistry flexibility, enabling the company to cater to an increasingly diverse set of high-utility applications—from electric mobility to stationary energy storage.

The batteries produced will power a wide array of emerging use-cases:
• EV charging infrastructure and on-board power units
• Home and residential backup solutions
• Grid-scale storage for renewable energy and load balancing
• Industrial and critical infrastructure backup
• Uninterrupted power applications far beyond traditional EVs

In alignment with global automation standards, Mercury EV-Tech has placed an order for a fully robotic, high-throughput production line from one of China's top-tier equipment providers. A technical team from India is set to inspect the facility in China on 15 April 2025, ahead of machinery shipment.

The equipment is scheduled to reach the Vadodara campus by end-April, with pilot production set to begin mid-May 2025.