• OPEN AN ACCOUNT
A+| A| A-|
Indian Indices
Sensex
78,233.68 469.77
( 0.60%)
Global Indices
Nasdaq
52,921.07 594.83
(1.14%)
Dow Jones
7,504.24 0.01
(0.00%)
Hang Seng
69,576.15 -167.92
(-0.24%)
Nikkei 225
10,673.34 20.47
(0.19%)
Forex
USD-INR
95.28 0.28
(0.30%)
EUR-INR
108.75 0.54
(0.50%)
GBP-INR
126.99 1.06
(0.84%)
JPY-INR
0.59 0.01
(0.97%)

EQUITY - MARKET SCREENER

Shiva Cement Ltd
Industry :  Cement - South India
BSE Code
ISIN Demat
Book Value()
532323
INE555C01029
-0.7440678
NSE Symbol
P/E(TTM)
Mar.Cap( Cr.)
N.A
0
513.6
EPS(TTM)
Face Value()
Div & Yield %
0
2
0
 

bajaj finance ltd
NTPC adds installed capacity of 800 MW of Patratu Vidyut Utpadan Nigam
May 18,2026
NTPC announced that Unit-2 (800 MW) of Patratu Vidyut Utpadan Nigam (PVUNL), a subsidiary of NTPC, has successfully completed trial run operation and consequently included in the installed capacity of NTPC. With this, the total installed capacity of NTPC group stands at 90,668 MW.